Access Equipment Shop

Access Equipment Shop
A range of ladders, steps, platforms and scaffolding to allow easy and safe access to items normally beyond reach. Including Loft Ladders, Plastic Steps, Work Platforms. Perfect for the maintenance, warehouse and production areas.
3Way Combination Ladder
Load Capacity: 150kg.
Working Height: 3700mm.
Lead time: 3 working days.
£100.00
Alpine Tower
3T compatible scaffold tower that is quick and easy to erect.
With 8 different height options.
Lead time: 2-3 weeks.
£661.00
Bridging Steps
Ideal for use in factories and distribution centres.
With 7 height options.
Lead time: 2 weeks.
£749.00
Climb-It Folding Work Platform
Two platform heights available - 880 or 994mm.
Capacity: 150kg.
Delivery in 3-5 working days.
£327.00
Crane Mounted Access Platform
With both Crane Slung & Fork Mounted options.
Capacity: 500kg.
Lead Time: 3-5 Working Days.
Call for Price: 01752 690622
Double Sided Machine Steps
Available as a Single or Double Sided Unit.
With 5 different height options to choose from.
Lead time: 1-2 weeks.
£184.00
EnviroFold Timber Loft Ladder
Floor to Ceiling Height: 2800mm.
Partially assembled for quick and easy installation.
In stock - available for next day delivery.
£140.00
EuroFold Timber Loft Ladder
Floor to Ceiling Height: 2800mm.
Using Renewable Energy and PEFC sustainably sourced timber.
In stock - available for next day delivery.
£133.00
Fork Mounted Folding Access Platform
Capacity: 250kg.
Assembled and folded in a matter of minutes.
Lead Time: 3-5 Working Days.
Call for Price: 01752 690622
Fork Mounted High Lift Access Platform
Comes with Slide Gate.
Capacity: 250kg.
Lead Time: 3-5 Working Days.
Call for Price: 01752 690622
Forklift Loading Platform
Capacity: 1000kg.
Base Size: 1900 x 1500mm.
Lead Time: 3-5 Working Days.
Call for Price: 01752 690622
Heavy Duty Combination Ladder
Available in 4 different sizes.
Max. Load: 150kg.
Lead time: 5 working days.
£255.00
Heavy Duty Plastic Safety Steps 1 Tread
Size: 465 x 310 x 300mm (LxWxH).
10 colours to choose from.
Lead time 2 weeks.
£63.00
Heavy Duty Plastic Safety Steps 2 Tread
Size: 500 x 545 x 415mm (LxWxH).
10 colours to choose from.
Lead time 2 weeks.
£86.00
Heavy Duty Plastic Safety Steps 3 Tread
Size: 500 x 790 x 620mm (LxWxH).
10 colours to choose from.
Lead time 2 weeks.
£125.00
Heavy Duty Plastic Safety Steps 4 Tread
Size: 490 x 1070 x 820mm (LxWxH).
10 colours to choose from.
Lead time 2 weeks.
£201.00
Heavy Duty Plastic Safety Steps 4 Tread with Handrail
Size: 490 x 1070 x 1620mm (LxWxH).
10 colours to choose from.
Lead time 2 weeks.
£326.00
Heavy Duty Platform Step Ladder
8 sizes to choose from.
Max. Load: 150kg.
Lead time: 5 working days.
£114.00
Heavy Duty Swingback Step Ladder
8 sizes to choose from.
Max. Load: 150kg.
Lead time: 5 working days.
£82.00
KAP Heavy Duty Access Platform
Available with 2-8 Treads.
6 different colour options.
Lead time: 7 weeks.
£648.00